Critical work is checked against the design and specification. Concealed elements are documented, and every deviation is corrected before construction continues.
01 · Placement
Setting out the home and preparing the site
02 · Foundation
Substructure, reinforcement and concrete work
03 · Structure
Load-bearing frame or stone masonry
04 · Envelope
Roof, façade, windows and exterior doors
05 · Engineering
Building systems and all concealed work
06 · Finishes
Materials, surfaces and fit-out
07 · Handover
Final inspection and home passport